EasyManua.ls Logo

KRAL BEM 200 - Control Panel and Handling; Control Panel Key Identification; Scope of Delivery and Unpacking; Transportation and Storage Guidelines

KRAL BEM 200
24 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Transportation, storage
6.1 Scope of delivery
5.1.5 Control panel
1
2
Fig.4: Control panel
1 SELECT key
3 CLEAR key
For information on operation. Ä Operation,Page14
6 Transportation, storage
6.1 Scope of delivery
The scope of delivery depends on the order option selected:
Order option Included in delivery
Standard
o Electronic unit BEM 200 + flow meter OME (mounted)
- or -
o Electronic unit BEM 200 + flow meter OMP (mounted)
Accessories
o Electronic unit BEM 200 + connecting element (not mounted)
- or -
o Electronic unit BEM 200 (not mounted, for wall mounting)
Tab.3: Included in delivery
6.2 Unpacking and checking the state of delivery
Personnel qualification: o Trained personnel
1. Upon delivery check the product for damage during transportation.
2. Report damage during transportation immediately to the manufacturer.
3. Dispose of packing material in accordance with the locally applicable regulations.
6.3 Transporting the electronic unit
Transport the electronic unit in the original packaging. Observe ambient conditions in the process
Ä Technical data,Page5.
6.4 Storing the electronic unit
Store the electronic unit in the original packaging in a cool and dry place. Observe ambient condi-
tions in the process Ä Technical data,Page5.
Operating instructions
OIE 24en-GB Edition 2022-01
9

Table of Contents

Related product manuals