EasyManuals Logo

KVH Industries TracVision R5SL Installation Guide

KVH Industries TracVision R5SL
19 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #8 background imageLoading...
Page #8 background image
9
Follow the steps below to seal the cable access
hole.
a. Seal the cable access hole on the roof with a
liberal amount of silicone sealant, RTV, or
equivalent to protect against leakage.
b. Install the clamshell ventilator, supplied in
the kitpack, over the cable access hole using
three of the supplied #6 screws (see
Figure 13).
c. Route the RF cable(s) to the grounding block
location you chose in “Plan the Installation”
on page 4.
d. Route the power/data cable through the
switchplate cutout you made in “Cut Out the
Switchplate Hole” on page 7.
Figure 13: Installing the Clamshell Ventilator
Clamshell
Ventilator
Power/Data
& RF Cables
#6 Screw (x3)
Seal the Cable Access Hole
7

Other manuals for KVH Industries TracVision R5SL

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the KVH Industries TracVision R5SL and is the answer not in the manual?

KVH Industries TracVision R5SL Specifications

General IconGeneral
BrandKVH Industries
ModelTracVision R5SL
CategoryAntenna
LanguageEnglish

Related product manuals