EasyManua.ls Logo

KYMCO ZING 150 - Page 55

KYMCO ZING 150
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. ENGINE REMOVAL/INSTALLATION
5
-
1
SERVICE INFORMATION
GENERAL INSTRUCTIONS
A engine stand or floor jack is required to support and maneuver the engine.
The following parts can be serviced with the engine installed in the frame:
Cylinder head/valves (Section 6)
Cylinder/piston (Section 7)
Starter motor/generator/left crankcase cover/starter clutch/camshaft (Section 8)
Clutch/gear shift mechanism (Section 9)
When removing and installing the engine, do not use a hammer or screw driver to strike or pry the
engine.
Do not damage the crankcase mating surfaces and clean off all gasket materials from the mating
surfaces.
After crankcase assembly, check that the transmission system operates smoothly.
After engine installation, start the engine and check that the lubrication system is normal.
Engine oil capacity:
At disassembly : 1.1 liter
At change : 1.0 liter
TORQUE VALUES
Engine bracket bolt 2.02.5kg-m
Drive gear lock bolt 0.81.2kg-m
Exhaust muffler hanger lock bolt 2.43.0kg-m
Rear fork pivot nut 5.56.5kg-m
Exhaust muffler joint lock nut 0.81.2kg-m
SERVICE INFORMATION .......................................................................................................5-1
ENGINE REMOVAL .................................................................................................................5-2
ENGINE INSTALLATION ........................................................................................................5-3

Table of Contents

Related product manuals