EasyManua.ls Logo

KYMCO ZING 150 - Engine Installation

KYMCO ZING 150
182 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. ENGINE REMOVAL/INSTALLATION
5
-
3
ENGINE INSTALLATION
Install the engine in the reverse order of
removal. Install the engine to its original
position with a jack or other adjustable
support.
When installing the engine, do not
damage the bolt thread and route the
wires and cables properly.
When installing the engine, be careful
to install the oil cooler pipes properly.
Install the gear shift lever by align the
punch mark on the lever with that on
the spindle.
Fill the crankcase to the proper level
with recommended engine oil.
After installation, perform the following
inspections and adjustments:
1. Throttle operation
2. Clutch lever free play adjustment
3. Drive chain adjustment

Table of Contents

Related product manuals