After this task is completed
• Connect the I/O-module-board power cable (see
“Cable routing for the I/O module board” on page 135).
• Install a front I/O bezel (see
“Install a front I/O bezel” on page 116).
• Install a front operator assembly (see
“Install a front operator assembly” on page 59).
• Install a drive cage (see
“Install a drive cage” on page 50).
• If necessary, install one or both M.2 boot drives onto the I/O module board (see
“Install an M.2 boot drive”
on page 70
).
• Proceed to complete the parts replacement (see
“Complete the parts replacement” on page 125).
Demo video
https://www.youtube.com/watch?v=uC3SFsq4HiM
Install a front I/O bezel
Follow instructions in this section to install a front I/O bezel.
About this task
To avoid potential danger, make sure to read and follow the safety information.
• S002
CAUTION:
The power-control button on the device and the power switch on the power supply do not turn off
the electrical current supplied to the device. The device also might have more than one power cord.
To remove all electrical current from the device, ensure that all power cords are disconnected from
the power source.
Attention:
• Read
“Installation Guidelines” on page 1 and “Safety inspection checklist” on page 2 to make sure that
you work safely.
• Touch the static-protective package that contains the component to any unpainted metal surface on the
node; then, remove it from the package and place it on a static-protective surface.
Note: Depending on the specific configuration, the front I/O bezel and I/O module board might look different
from the illustrations in this section.
Procedure
Step 1. Make preparations for this task.
a. Make sure that the system board, bridge board, and I/O module board have been installed (see
“Install a system board (trained technician only)” on page 108, “Install a bridge board” on page
112, and “Install an I/O module board” on page 114).
116
ThinkEdge SE350 V2 Hardware Maintenance Guide