CAUTION: 
Hazardous voltage, current, and energy levels might be present. Only a qualified service technician 
is authorized to remove the covers where the label is attached. 
•  S033 
CAUTION: 
Hazardous energy present. Voltages with hazardous energy might cause heating when shorted 
with metal, which might result in spattered metal, burns, or both. 
Attention: 
•  Read the 
“Installation guidelines” on page 61 to ensure that you work safely.
•  Ensure that all adapters and other components are installed and seated correctly and that you have not 
left loose tools or parts inside the server.
•  Ensure that all internal cables are correctly routed (see 
“Internal cable routing” on page 35).
Watch the procedure 
A video of this procedure is available at YouTube: 
https://youtube.com/playlist?list=PLYV5R7hVcs- 
DoEcxrm2zKNpaKOdZ3f8Qc
.
Procedure
Step 1.  Install the server cover. 
a. 
Align the tabs on the server cover with the corresponding slots on the top edge of the 
chassis.
b. 
Pivot the server cover to close it.
98
ThinkSystem ST250 V2 Setup Guide