Figure 28. Hot-swap power supply label
• Ensure that the devices that you are installing are supported. For a list of supported optional devices for
the server, go to:
https://static.lenovo.com/us/en/serverproven/index.shtml
Attention:
• Read the
“Installation guidelines” on page 61 to ensure that you work safely.
• Touch the static-protective package that contains the component to any unpainted metal surface on the
server; then, remove it from the package and place it on a static-protective surface.
Watch the procedure
A video of this procedure is available at YouTube:
https://youtube.com/playlist?list=PLYV5R7hVcs-
DoEcxrm2zKNpaKOdZ3f8Qc
.
Procedure
Step 1. If there is a power supply bay filler installed, remove it.
Important: During normal operation, each power supply bay must contain either a power supply or
power supply filler for proper cooling.