Commissioning
5-3
BA9300POS EN 2.3
The following table lists the procedure for the commissioning of a position control according to the
example in Fig. 5-1. A comprehensive description of the commissioning of position controls can be
obtained from the following chapters.
Section Action Detailed
description
Switch on
controller
1. Assign terminal X5/28 (controller enable)to LOW signal.
2. Assign terminals X5/E1 and X5/E2 to HIGH signal (+13...+30V).
3. Assign terminals X5/E3 to X5/E5 to LOW signal.
4. Switch on mains:
The controller is ready for operation after approx.1s
(2 s for drives with sine-cosine encoder with serial interface).
^
5-5
Switch on PC Start GDC on the PC
Set the communication parameters for online operation in the Momentary drive dialog box. Confirm with OK”.
Select the controller in the Assign controller description” dialog box. Confirm with OK”.
^
5-5
Generate
1. Adapt controller to the mains
^
5-6
parameter set
2. Adapt controller to the motor
^
5-7
3. Enter machine parameters
^
5-8
Manual control
1. Enter parameters for manual positioning or use default setting
^
5-9
2. Enable controller
^
5-10
3. Function test with manual control
^
5-11
Enter parameters
for positioning
profile
1. Enter positioning data in the Programming” dialog box.
2. Connect the X5 terminals in the Terminal monitor 93XX (digital) menu
When the digital terminals X5 are supplied with internal voltage;
Assign output X5/A1 with FIXED1. The output on terminal X5/A1 is approx. 24V.
TIP!
For this application, you may use one of the predefined configurations in C0005.
C0005 = XXX1X (e.g. 20010 = absolute positioning with control via terminals) assigns FIXED1 automatically to the output
X5/A1.
^
5-13
Control drive 1. Check whether the drive is ready for operation:
When the green LED is flashing: Controller is ready for operation, go on with step 2.
When green LED is off and red LED is flashing: Interference. Before proceeding with commissioning, eliminate the fault.
2. Enable controller
Green LED is illuminated when a HIGH signal (+13...+ 30V) is assigned and no other source of the controller inhibit is
active.
3. For operation with a fieldbus module, additional settings are necessary (see operating instructions of the fieldbus module).
The motor now rotates with the provided set-value and the selected direction of rotation.
^