EasyManua.ls Logo

Lenze E84DGDVB7514 - Mechanical Installation

Lenze E84DGDVB7514
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
Mechanical installation
5
62
EDS84DG752 EN 5.0
5.5 Mechanical installation
ƒ If the cooling air is polluted (fluff, (conductive) dust, soot, aggressive gases), take
adequate countermeasures, as e.g.:
Regular cleaning of the cooling ribs at the controller
Separate air guide
ƒ Possible mounting position:
Observe information on mounting conditions in the chapter ”Technical data”.
ƒ Maintain the specified free spaces above and below the controller to other
installations!
ƒ Ensure untroubled cooling and exhaust air flow.
Arrangement of several devices only to the sides
For mounting, use the screws of the motor terminal box. The installation material must
ensure a durable mechanical connection.
If screws must be replaced, we recommend the following, depending on the motor frame
size:
ƒ M4/M5/M6 cheese head screw, hexagon socket, according to DIN 912/ISO 4762
ƒ M4/M5/M6 cheese head screw, torx, according to ISO 14579

Table of Contents

Other manuals for Lenze E84DGDVB7514

Related product manuals