EasyManua.ls Logo

Linde H25D - Servicing the Air Conditioning (Special Equipment)

Linde H25D
268 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5 Maintenance
Chassis, bodywork and fittings
d3921504
1
3
4
¾ Feed a restraint strap (3) around the steer-
ing wheel and hang it onto the bolt (4).
Closing the floorplate
¾ Lift up the floorplate.
¾ Detach the restraint strap.
¾ Close the floorplate.
¾ Install plates (5) and (6).
¾ Secure the floorplate with the fix
ing screws
(2).
¾ Replace the rubber covering on the floor-
plate.
¾ Close the bonnet.
Servicing the air conditioning (spe-
cial equipment)
The following maintenance work must be car-
ried out at the beginning, middle and end of a
season:
¾ Check the belt tension at the comp
ressor.
¾ Check the refrigerant level and moisture
content in the system.
The refrigerant must flow, bubble-free,
through the sight glass of the dryer (1) when
the engine is running.
When changing a component in the c
ooling
circuit, the dryer must be change
d before re-
filling.
¾ Clean the condenser.
When cleaning the condenser fins, do not
press hard, otherwise they will be damaged
and air will no longer flow properly across
them.
When performing maintenance wor
k, please
consult your authorised dealer.
154 Operating Instructions 393 807 1001 EN 08/2008

Table of Contents

Related product manuals