EasyManua.ls Logo

LS tractor J2020H - Upper Link Installation and Adjustment; Adjustment of Lift Rods Length; Adjustment of Stabilizers Length

LS tractor J2020H
101 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(2) Upper link installation and
adjustment
Adjust the upper link
①
depending on the
implements.
Length of the upper link
①
can be adjusted by
turning the grip
②
.
Fasten the lock nut
③
.
Adjusting range : 15.7 ~ 29.5 inch.
▶
Insert the snap-pin
⑤
correctly to prevent the upper link pin
④
from being
detached.
Notice
(3) Adjustment of the lift rod’s
length
Lift rod (RH) can be adjusted by loosening the
lock-nut
②
and turning the body
①
.
②
②②
②
①
①①
①
④⑤
④⑤④⑤
④⑤
③
③③
③
②
②②
②
4
4 4
4 - 10
After adjusting, tighten the lock-nut
②
again.
(4) Adjustment of stabilizer’s length
The length of the stabilizer can be adjusted by
turning the handle
②
after removing the fixing-pin
①
.
After adjusting, insert the fixing-pin
①
again.
▶
Adjust the clearance of lateral
shaking of the implement to be
within 20~40mm (0.79~1.57 in).
Notice
①
①①
①
①
①①
①
②
②②
②

Table of Contents