EasyManuals Logo

LUDLUM 3030E-2 User Manual

LUDLUM 3030E-2
79 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #41 background imageLoading...
Page #41 background image
Model 3030 & 3030E Series Technical Manual Section 7
Ludlum Measurements, Inc. Page 29 November 2017
10. Press the COUNT button to exit the QC check mode.
HV Plateau
A high-voltage (HV) plateau is normally run at calibration time in order to
set the proper HV and to determine the operating efficiencies. This routine
is provided to automate the plateau procedure and simplify the calculations.
This screen allows you to enter the starting and ending value, the voltage
increment, and the source size. The background count is always one minute.
The data may be saved in a text file or printed to a printer.
The plateau order can be changed from Alpha, Beta, Background to Beta,
Alpha, Background.
STEPS FOR PERFORMING A HIGH VOLTAGE PLATEAU
1. Turn the Model 3030 on and connect to a computer by way of a
serial port with supplied cable.
2. Run the Model 3030 control software. Software will automatically
detect the instrument and download all parameters.
3. When all the parameters have been downloaded, click on the tab
marked “HV Plateau at the top of the window.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the LUDLUM 3030E-2 and is the answer not in the manual?

LUDLUM 3030E-2 Specifications

General IconGeneral
BrandLUDLUM
Model3030E-2
CategoryMeasuring Instruments
LanguageEnglish

Related product manuals