B: Operation Instructions:
B-1 : Power on the instrument by pressing POWER KEY,
and then press 1Φ3Φ KEY to select the 3Φ4W system,At the
time, display will show 3Φ4W connect diagram approx. 4 sec.
and the selected name of system will be appeared on bottom
left display of screen 2.
B-2 : Connect the line voltage L1, L2, L3 and Vn to
V1, V2, V3 and N terminals of the instrument.
B-3 : Place the conductor of CP-1201(A1), CP-1201(A2)、
CP-1201(A3) hook to A1, A2, A3 as screen 1.
B-4 : Connect the outputs of clamp meter
CP-1201(A1), CP-1201(A2), CP-1201(A3) to
A1、A2、A3 terminals of the instrument.
B-5 : The related measuring factors will be appeared
on display, about the instruction of factor please refer
appendix 1 ( 5-16, page 68 ).
Remark:
During connection ,If want to check connect Correct or not,
please press and hold the "▼" key, display will show 3Φ4W
connect diagram,when release the "▼" key , will back to
measurement.
screen 2 ( 5-4 )
0.0 V
0.0 V
0.00 A
0.0 V
0.0 V
0.00 A
0.0 V
0.0 V
0.00 A
-0.000 KW
0.000 KVA
-0.000 KVAR
-0.000 KW
0.000 KVA
-0.000 KVAR
-0.000 KW
0.000 KVA
-0.000 KVAR
-0.000 KW
0.000 KVA
-0.000 KVAR
- 0.00
- 0.00
0
0.00
0.00
- 0.0°
- 0.0°
-0.0°
0.000 KWH
0.000 KVAH
0.000 KVARH
0.0 Hz
20A
3Φ4W
SEC: 2 CT: 1 PT: 1