EasyManua.ls Logo

Lynx Yeti 550 - OPERATING INSTRUCTIONS; Propulsion, Turning, and Stopping; Starting the Engine

Lynx Yeti 550
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BREAK-IN PERIOD
Engine
IMPORTANT: A break-in period of
10-15 hours (about 500 km ) is required
for Rotax engines before running the
snowmobile at full throttle.
During break-in period, maximum
throttle should not exceed ¾. How-
ever, brief full acceleration and
speed variations contribute to a good
break-in.
All models except 4-tec and 2-tec
SDI m odels: To assure additional pro-
tection during the initial engine break-
in, 500 ml of recommended injection
oil should be added to fuel for the first
full filling o f fuel tank.
Have spark plugs cleaned after engine
break-in.
Drive Belt
A new drive belt requires a break-in pe-
riod of 50 km. Avoid strong accelera-
tion/deceleratio n, pulling a lo ad or high
speed cruising
10 Hour Inspection
We sugg est th at after the first 10
hours of operation— 500 km or
30 days after the purchase, whichev-
er comes first, your snowm obile be
checked by an authorized Lynx dealer.
NOTE: The 10 hour inspection is at
expense of the snowmobile owner.
_____________________
45

Table of Contents