EasyManua.ls Logo

Magnetic MHTM FlowMotion mWing - Page 5

Default Icon
80 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5
mWing
Contents
8.4 Connecting customer control lines 62
8.4.1 Connecting emergency opening contacts 63
8.5 Installing and connecting customer-access control devices 63
8.6 Checking the electrical connections 64
9 Commissioning 65
9.1 Safety during commissioning 65
9.2 Putting the pedestrian gate into operation 65
9.3 Switching the pedestrian gate on and off 65
9.4 Parameterising the pedestrian gate 67
10 Test book 67
11 Operation 68
12 Cleaning and maintenance 69
12.1 Cleaning the pedestrian gate 69
12.2 Maintenance schedule 69
13 Corrective action 70
14 Spare parts and repair 70
15 Customer service 70
16 Decommissioning 71
16.1 Safety during decommissioning 71
16.2 Take the pedestrian gate out of operation 71
17 Disassembly and disposal 72
17.1 Safety during disassembly and disposal 72
17.2 Dismantling and disposing of the pedestrian gate 72
18 EU-Declaration of Conformity 73
Index 75

Table of Contents