EasyManua.ls Logo

Manitowoc 31000

Manitowoc 31000
126 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Reference Only
SET-UP AND INSTALLATION 31000 LUFFING JIB OPERATOR MANUAL
4-56 Published 07-23-15, Control # 078-03
59
Information below from drawing A19443, Sheet 25:
Pay in the load hoist line (A) and lower the jib strut (B) until the suspended straps (C) are positioned vertically
over the last insert strap (D).
Disconnect the sling (E) and the load hoist line (A).
Step Action
FIGURE 4-59
A
Item Description
A Load hoist line (Drum 1 or Drum 3).
B Jib strut.
C Suspended straps.
D Insert strap.
E Sling.
F Jib strut angle (54.6° to 56.1°).
B
C
C
D
E
F

Table of Contents

Related product manuals