Manitowoc Published 07-23-15, Control # 078-03 4-73
31000 LUFFING JIB OPERATOR MANUAL SET-UP AND INSTALLATION
4
3
Information below from drawing A19443, Sheet 28:
Slowly boom down as the upper boom point wheel (A) contacts the ground and rolls towards the crane.
When the upper boom point (B) rotates into position against the load pins (C), reinstall the locking pins (D).
As required, install aircraft warning flag (E), warning light (F), and wind speed indicator (G).
4
This completes the Method 1 upper boom point installation procedure.
Step Action
FIGURE 4-79
Item Description
A Upper boom point wheel.
B Upper boom point.
C Load pin.
D Locking pin.
E Aircraft warning flag.
F Warning light.
G Wind speed indicator.
Boom down
A
B
C
D
E
F
G