MAINTENANCE CHECKLIST RT530E-2 OPERATOR’S MANUAL
6-2 Published 5-3-2016, Control # 555-02
Weekly or 50 Hour Check List
19 Fuel/Water Separator: Drain moisture
20 Air Cleaner: Check for proper service/level. Check for cracks or leaks
21 Hook Block and Headache Ball Safety Latch: Check for proper working order. Check for cracks and leaks;
Check for excessive wear
22 Lock-out Cylinder and Swing Potentiometer: Check for proper operation while operating machine. Check for
proper adjustment
1 Sheaves: Check for proper operation, excessive wear, and damage.
Reference Only