EasyManua.ls Logo

Manitowoc Grove RT765E-2 - Page 204

Manitowoc Grove RT765E-2
330 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-22
Published 9-04-2014, Control # 422-08
HOIST AND COUNTERWEIGHT RT765E-2 SERVICE MANUAL
7. Secure the counterweight to the superstructure with the
two counterweight pin assemblies. To secure each pin
assembly, push it in and turn it so its roll pin engages the
related catch on the counterweight. Then release the pin
assembly so its spring can hold the pin assembly in
place.
8. Adjust the four counterweight leveling bolts Figure 5-13
to eliminate any relative movement between the
counterweight and the turntable.
9. The crane is now ready for operation with the
counterweight installed.
FIGURE 5-13
Bolt
Reference Only

Table of Contents

Other manuals for Manitowoc Grove RT765E-2

Related product manuals