TS 910 TRANSFER SWITCH
PM140 REV 2 14/01/23 47 Thomson Power Systems
NOTE
Should utility power fail during a no-load test operation, the load will
automatically transfer to the generator and will re-transfer back when utility
power is restored to within normal conditions. The engine will continue to run
until the 30 minute exercise time delay period expires.
18.15.5 ENGINE START DELAY JUMPERS
A TSC 9 PCB mounted jumper is provided to configure the desired Engine Start
Delay timer settings. Three time settings are provided - 3 seconds, 6 seconds or
10 seconds. A jumper must be placed across the 2 pins, adjacent to the desired
time as shown on the PCB.
Refer to Section 18.15.1 for the factory default settings of the Engine Start Delay
timer.
18.15.6 ENGINE WARMUP DELAY JUMPERS
A TSC 9 PCB mounted jumper is provided to configure the desired Engine
Warm-up Delay timer settings. Three time settings are provided – 10 seconds,
30 seconds or 60 seconds. A jumper must be placed across the 2 pins, adjacent
to the desired time as shown on the PCB.
Refer to Section 18.15.1 for the factory default settings of the Engine Warm-up
Delay timer
18.15.7 ENGINE COOL DOWN DELAY JUMPERS
A TSC 9 PCB mounted jumper is provided to configure the desired Engine Cool
down Delay timer settings. Three time settings are provided – 1 minute, 2
minutes or 5 minutes. A jumper must be placed across the 2 pins, adjacent to
the desired time as shown on the PCB.
Refer to Section 18.15.1 for the factory default settings of the Engine Cool down
Delay timer
18.15.8 UTILITY RETURN DELAY JUMPERS
A TSC 9 PCB mounted jumper is provided to configure the desired Utility Return
Delay timer settings. Three time settings are provided – 10 seconds, 60 seconds
or 120 seconds. A jumper must be placed across the 2 pins, adjacent to the
desired time as shown on the PCB.