52 - Installation manual - Ecotype
5.4.8 Replacement of broken or damaged fastening hooks on the outer board wall (only when the
components are present)
• Replace the hooks at the first sign of wear and tear.
5.4.9 Lubricate and grease thoroughly the covering system
1) GREASE THE INTERNAL COUPLING BETWEEN
PINION AND GEAR (hand-operated version)
Make use of lithium-based grease.
CLEAN AND LUBRICATE THE VARIOUS PULLEYS LOCATED ON THE MACHINE,
CABLES, GROOVES AND SLOTS OF THE PULLEYS, BY APPLYING SVITOL® or WD-40
LUBRICATING OIL OR A SIMILAR PRODUCT.
5.4.10 Filling in the machine control register
The manual handed over to the customer includes a chapter referred to as “Control register”.
The Control register MUST ALWAYS BE fulfilled, completed with a report and duly signed by the firm that carried out the
extraordinary maintenance work on the machine.
In the event of a legal dispute the lack of the necessary entries in the Control register of the customer’s
machine could also implicate for you an involvement in civil and criminal objective liability.