T: +44 (0)1443 230935 F: +44 (0)1443 231531 E: enquiries@markes.com
www.markes.com
2.2 Sequence of operation
When a tube is placed and sealed into the flow path of UNITY 2 for conventional 2(3) stage desorption, it
undergoes the following sequence of operations: standby, leak test, prepurge, primary desorption, pre trap
fire purge and secondary desorption.
2.2.1 Standby
Sample Tube
Split Tube
Cold Trap
GC
Heated Valve