EasyManua.ls Logo

Markes International Unity 2 - Page 39

Markes International Unity 2
67 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
QUI-1057
Page 39
Markes International Ltd
T: +44 (0)1443 230935 F: +44 (0)1443 231531 E: enquiries@markes.com
www.markes.com
Tube desorption may be carried out split or splitless i.e. all the sample from the
sample tube can be transferred to the trap or part of it sent to the split vent. If a
split is required during tube desorption (a so-called inlet split, see Section 1.4)
check the relevant box. If the split is selected to be off during tube desorption,
all the analytes will be transferred from the tube to the cold trap.
If an elevated temperature purge is required, see Section 2.6.4, then Time 1
and Temp 1 should be set to reflect the required elevated Prepurge time and
temperature. In this case, Time 2 and Temp 2 become the actual analytical tube
desorption time and temperature and time values should be entered
appropriately.
Typical elevated temperature purge settings are 5-15 minutes at 50-100°C.
Trap Desorb Set the Trap Low temperature by clicking in the box and typing in the required
value.

Table of Contents

Other manuals for Markes International Unity 2

Related product manuals