EasyManua.ls Logo

Maschio ENTRY 150 - Page 3

Default Icon
88 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
USE AND MAINTENANCE
ENGLISH
Cod. F07022163
pag.1
Pre-delivery inspection
The following inspections, adjustments and interventions were performed before machine’s delivery:
All grease fittings lubricated.
Gearbox oil level checked and topped up (as necessary).
Tyre inflation checked and adjusted.
All screws and nuts tightened.
Grease removed from the mesh cutter.
Monitor battery cable properly connected.
Testing cycle performed.
Hatch opened and closed freely.
Pre-cutting device properly operating.
Monitor properly operating.
Switches and sensors properly adjusted.
Absence of leaks from hydraulic hose or respective connections verified.
Proper chain tension and lubrication verified.
Paint and stickers smooth and clean.
Delivery of operator's manual to customer.
Delivery of other documentation (CE – road approval where required).
The operator is aware of the safety precautions to be followed with the machine.
Remove the packaging used for delivery / shipment from the round baler, taking care not to damage the
machine.
Date:
Signature of the dealer or his technician:

Table of Contents

Related product manuals