Mark ProVis Injection System
4 - 2
Recommended
Schedule
The injection system must be properly maintained to ensure that it is
in peak operating condition. Your individual maintenance schedule
depends upon how your injector is used; the type of procedures per
-
formed, and frequency of use. The following guidelines represent a
suggested maintenance schedule:
Daily:
Before use each day, the system should be inspected, and the injector
head piston rod thoroughly cleaned.
Monthly:
Once a month, the entire system should be thoroughly inspected and
cleaned, and an operational checkout should be performed.
Annually:
Once per year, Electrical Leakage and Ground Continuity checks
should be performed.
NOTE: Local regulations or hospital protocol may require elec-
trical leakage checks at more frequent intervals. If this
applies, local regulations for leakage must be followed.
MEDRAD also recommends that a complete system calibration and
performance checkout, by a qualified MEDRAD Service Representa
-
tive, be performed once a year. Contact MEDRAD Factory Service, or
your local MEDRAD office for details.
In the United States, Canada, Europe, and other select areas of the
world, the MEDRAD Service Department offers Preventive Mainte
-
nance Programs. These annual programs greatly assist in maintaining
accuracy and reliability, and can extend the life of the injection system.
Contact MEDRAD for details. In Europe, contact MEDRAD Europe
B.V., or your local authorized dealer, for further information. Refer to
Section 2 of this manual for address and telephone numbers.
NOTE: Failures which occur due to lack of proper mainte-
nance, or abuse, will not be covered under warranty.