Fuse Replacement
29
To avoid electrical shock, remove test leads and any
input signals before opening the case. Do not operate
with open case. Install only the same type of fuse or
equivalent.
Fuse Replacement Procedure
The meter uses a 500V/0.63A IR 200kA fast acting fuse
(Fuse 1) for mA µA input, and a 600V/15A IR 100kA fast
acting fuse (Fuse 2) for A input.
1) Disconnect the meter from any circuit and remove the
test leads from the input jacks.
2) Turn the meter OFF.
3) Loosen the four captive screws from the case bottom
and turn the case over.
4) Replace the blown fuse(s).
6) Replace the case top, ensuring that all the gaskets
are properly seated and the two clips on the case top
(near the LCD side) are engaged.
7) Re-fasten the four captive screws.