EasyManuals Logo

Mercury 200 VERADO Installation Manual

Mercury 200 VERADO
51 pages
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #51 background imageLoading...
Page #51 background image
200/225/250/275 VERADO 4-STROKE
90-10238051 Page 51 / 51
NOTE: Wires can only be pushed into the connector one way. Align the wire terminal with
the tabs inside the connector. Have the wiring routed through the transom. Push each
wire terminal into its respective location in the connector. Push wire in until they snap into
place. Secure wires into connector with the wire retainer.
A A
B B
C
C
D D
A A
B B
C
C
D D
a
b
b
W H T
Y E L
B L U
B L K
ob01512
a - Connector b - Wire retainer
Template - Paddle Wheel Speed Sensor
a
b
ob01513
a - Drill holes here
b - Align dotted line with the transom bottom edge and fold under

Table of Contents

Other manuals for Mercury 200 VERADO

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Mercury 200 VERADO and is the answer not in the manual?

Mercury 200 VERADO Specifications

General IconGeneral
Engine Type4-Stroke
Gear Ratio1.85:1
Full Throttle RPM Range5800-6400 RPM
Fuel SystemElectronic Fuel Injection (EFI)
ExhaustThrough Prop
Horsepower200 HP
Fuel Induction SystemElectronic Fuel Injection (EFI)
Shaft Length20", 25"
StartingElectric
Fuel Type87 Octane
Cylinder ConfigurationInline-6
Cooling SystemWater-cooled with thermostat

Related product manuals