OPERATION
DC welding.
5. Lay the outside edge of the Gas Cup on the work piece with the Tungsten Electrode 1- 2mm from
the work piece. Press and hold the torch switch to activate to gas flow and welding power.
6. With a small movement rotate the Gas Cup forward so that the Tungsten Electrode touches the
work piece.
7. Now rotate the Gas Cup in the reverse direction to lift the Tungsten electrode from the work piece
to create the arc.
8. Release the trigger to stop the welding.