Putting the unit into service
45Installation instructions
Wastewater connection Yes No
Wastewater connection made properly?
Waste trap in the building Aerator
Funnel drain Floor gutter
Connection dimension of wastewater line: ____________________ mm
Exhaust air connection Yes No
Setting up below ventilation system?
Connected to exhaust air duct?
Connection dimension of exhaust air line: ____________________ mm
Length of exhaust air line: ________________________ mm
Function check Yes No
Controls are functioning?
Monitoring of the cooking zone door is functioning?
Self-diagnostic program run without faults?
Fault: _______________________________________________________________________
Final notes Yes No
Was the unit put into service?
Comments:
Operator trained?
Electrical installation was provided by:
Company Installer City, date Signature
The connection to a kitchen management system was made by:
Company Installer Place, date Signature
Water installation was provided by:
Company Installer City, date Signature
Wastewater installation was provided by:
Company Installer City, date Signature
Exhaust air connection was provided by:
Company Installer City, date Signature
10013865-0AIBE-B