EasyManua.ls Logo

Mychef iCOOK - Page 74

Mychef iCOOK
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
mychefcooking.com
PRODUCT MANUAL iCOOK - DT.MP.IC.2201.2
74
The right screen shows the maintenance plans, pressing the review buttons displays the
required activities to be performed.
The top bar shows the progress in operating hours associated with servicing. Once the
revision has been carried out, the date on which it was carried out will be indicated as shown
in the image above.
Check A:
- Water hardness testing
- Cleaning of cooling fans
- Electronic cleaning
- Cleaning of the drain tray
- Change of gasket and door adjustment
Check B:
- Temperature calibration
- Adjustment of the internal screws and bolts
Check C:
- Change of chimney pipes and drain pipes
- Change of solenoid valve for water injection
- Resistor contactor change
Check D:
- Engine change
- Change of resistance and seal
- Water injection pipe gasket replacement

Table of Contents

Other manuals for Mychef iCOOK