Page 20
1. Replace 2x valves.
2. Re-t 2x elbows, 1x tee.
3. Re-t 2x blanking plugs.
4. Re-t valves to bracket.
5. Re-t valve bracket assy to dryer.
6. Aach inlet valve tubes to block.
7. Aach solenoid plugs to solenoid coils.
8. Re-t Silencer box (refer to Page 18:2)
6. Remove 2x elbows, 1x tee,
2x blanking plugs from valves.
(See gure 5)
12. SERVICE ‘B’ INSTRUCTIONS
MODELS: NDL-100, 110, 120, 130
Assemble opposite to
dis- asssembly as follows:
5. Remove 6x (M3x30) screws, nuts, washers
and detach valves from bracket.
(See gure 4)
(Every 24,000 hrs or 4 Years)
INLET PILOT CONTROL VALVE REPLACEMENT
CVK-130 & EVK-130 & PVK-131
Figure 4.
Figure 5.