EasyManua.ls Logo

NANO D2 Series - Page 20

NANO D2 Series
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 20
1. Replace 2x valves.
2. Re-t 2x elbows, 1x tee.
3. Re-t 2x blanking plugs.
4. Re-t valves to bracket.
5. Re-t valve bracket assy to dryer.
6. Aach inlet valve tubes to block.
7. Aach solenoid plugs to solenoid coils.
8. Re-t Silencer box (refer to Page 18:2)
6. Remove 2x elbows, 1x tee,
2x blanking plugs from valves.
(See gure 5)
12. SERVICE ‘B’ INSTRUCTIONS
MODELS: NDL-100, 110, 120, 130
Assemble opposite to
dis- asssembly as follows:
5. Remove 6x (M3x30) screws, nuts, washers
and detach valves from bracket.
(See gure 4)
(Every 24,000 hrs or 4 Years)
INLET PILOT CONTROL VALVE REPLACEMENT
CVK-130 & EVK-130 & PVK-131
Figure 4.
Figure 5.