EasyManua.ls Logo

NARDA PMM 7010/00 - Rack Requirements

NARDA PMM 7010/00
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-4 PMM 9010-RMA Rack Mount Adapter
6.7 Rack Requirements
The rack must be of the following type:
- Standard 19 inch (483 mm) with mounting rails that conform to English
universal hole spacing per section 1 of ANSI/EIA-310-D-1992.
- The minimum vertical rack space per chassis must be 3U (rack units),
equal to 3 inches (132,5 cm).
6.8 Required Equipment
Before you begin the installation, ensure that you have the following items:
- Crosshead screwdriver (not provided)
- Flat-blade screwdriver or rack-insertion tool (not provided)
- Tape measure and level (not provided)
- Rack Mount kit (provided)
6.9 Moving chassis
When lifting the chassis, be aware of its weight, and follow these
guidelines:
- Disconnect all power and external cables before lifting the chassis.
- Remove all instruments from the chassis before lifting.
- Make sure that the milled knob well locking.
- Using the two handles, lift the PMM 9010-RMA slowly keeping your back
straight. Lift with your legs, not with your back. Bend at the knees, not at
the waist.

Related product manuals