EasyManuals Logo

NEC C751Q User Manual

NEC C751Q
71 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #29 background imageLoading...
Page #29 background image
©2018 NEC Display Solutions, Ltd. Page 29 of 71
cd Desktop
Clone the usbboot tool repository:
git clone --depth=1 https://github.com/raspberrypi/usbboot.git
cd usbboot
4. Install libusb using the following command:
sudo apt-get install libusb-1.0-0-dev
5. Now build and install the usbboot tool:
make
sudo make install
Run the usbboot tool and it will wait for a connection:
sudo rpiboot
You should see
Waiting for BCM2835/6/7
6. Power up the Compute Module in USB boot mode:
a. Make sure the USB cable is directly connected between the host PC and the display. Do
not use a USB extender cable or hub between the host PC and the display.
b. On the NEC display select the COMPUTE MODULE video input.
c. Navigate to the COMPUTE MODULE menu on the OSD.
d. Select POWER.
e. If POWER SUPPLY is currently ON then change it to OFF and confirm.
b
c
e
d

Table of Contents

Other manuals for NEC C751Q

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the NEC C751Q and is the answer not in the manual?

NEC C751Q Specifications

General IconGeneral
BrandNEC
ModelC751Q
CategoryMonitor
LanguageEnglish

Related product manuals