Hardware, Installation and Maintenance Manual 2 - 1
___________________________________________________________________________________
___________________________________________________________________________________
Chapter 2
IPK IAD(8)-U( ) ETU Setup
SECTION 1INSTALLING THE IAD(8)-U( ) ETU
1.1 System Requirements
The IAD(8)-U( ) ETU can be viewed and installed like any other ETU used in
the KTS system. (Refer to Appendix E Electra Elite IPK IAD(8)-U( ) ETU
Installation.) However, the CAT5 Ethernet cable plugs into the Ethernet
connector on the front of the ETU, and not through the regular connections as
with other interface boards.
1. Set the IAD(8)-U( ) ETU to desired card type in accordance with the dip
switch settings. (Refer to Table 1-3 IAD(8)-U( ) ETU Switches on page
1-4.)
2. Place the IAD(8)-U( ) ETU in the Electra Elite IPK KSU.
3. Connect the Ethernet cable to the J6 connector.
4. The CH1~CH8 LEDs start to run indicating that the system is initializing
the IP networking parameters. The status LED is red. (Refer to Table
1-1 Default Boot Sequence: In Active IAD(8)-U10 ETU - Without IP
Application Loaded on page 1-2.)
5. Once all LEDs are off and the status LED (D12) is flashing red, the IAD
(8)-U( ) ETU can be set up with the system.
1.2 Installation Precautions
As with all static sensitive devices, the ETU must be installed following the
Electra Elite IPK hardware installation general directions.