EasyManua.ls Logo

NEC Electra Elite IPK - Installing the ETU in the Electra Elite KSU

NEC Electra Elite IPK
58 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
E - 2 Electra Elite IPK IAD(8)-U( ) ETU Installation
___________________________________________________________________________________
___________________________________________________________________________________
Document Revision 4 MEGACO Station
2.2 INSTALLING THE ETU IN THE ELECTRA ELITE KSU
When the IAD(8)-U( ) ETU is used for the Megaco station application, this
ETU is assigned in the Electra Elite IPK system as an ESI(8)-U( ) ETU. This
ETU has eight ports, and installed in slots S1~S8 of the Electra Elite IPK KSU.
To install the ETU:
1. Insert the IAD(8)-U( ) ETU in to any slot in the KSU. Make sure that all the
switches in S2 are set to the ON position (factory default).
2. Once the LEDs CH 8(D1) and CH7(D3) are lit SOLID and the Status LED (D12)
is flashing red, connect your cross over cable or hub to Ethernet connector (J6)
on the IAD(8)-U( ) ETU. The IAD(8)-U( ) is ready to install your IP Application
package.
Figure E-1 IAD (8)-U( ) ETU

Other manuals for NEC Electra Elite IPK

Related product manuals