EasyManua.ls Logo

NEC Express5800 120Lh - Page 240

NEC Express5800 120Lh
314 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9-28 Upgrading Your Server
6. Fix the rails coming with the server to the 5.25-inch device by using the four screws
coming with the device.
IMPORTANT:
Always use the screws coming with the 5.25-inch device. Using
longer screws or those of different diameter may cause the device to
be broken.
When installing a double-height device, use the DLT device rails
that come with the server.
7. Push the 5.25-inch device to the device bay carefully.
NOTE: Make sure that the cables are not caught while the 5.25-inch
device is pushed into the slot.
IMPORTANT: If a 5.25-inch device occupying two slots cannot be
inserted easily, push the device to the slots with it lifted a little.
8. Fix the rails by using the screws removed in step 3.
Half-height device Full-height device
9. Check whether the installed 5.25-inch device is projected too much from the front of the
server.
Check the device installed in a 5.25-inch device bay based on the CD-ROM drive
normally installed.

Table of Contents

Related product manuals