Chapter 4. Installation | 24
4
4. Installation
This chapter describes the installation procedures for your GS728TS, GS728TPS, GS752TS,
and GS752TPS Smart Switch. Switch installation involves the following steps:
Step 1: Preparing the Site
Step 2: Installing the Switch
Step 3: Checking the Installation
Step 4: Connecting Devices to the Switch
Step 5: Installing an SFP Transceiver Module
Step 6: Installing Device as Stand-alone or Stack Master
Step 7: Applying AC Power
Step 8: Managing the Switch using a Web Browser or the PC Utility