Notes: [1] Installers should be members of an appropriate Competent Persons Scheme. [2] All installations in England and Wales must be
notified to Local Area Building Control (LABC) either directly or through a Competent Persons Scheme. A Building Regulations Compliance
Certificate will then be issued to the customer. [3] May be required for systems covered by G3 Regulations
© Heating and Hotwater Industry Council (HHIC)
www.centralheating.co.uk
AIR TO WATER HEAT PUMP COMMISSIONING CHECKLIST
This Commissioning Checklist is to be completed in full by the competent person who commissioned the heat pump and associated equipment as a means of
demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission this equipment to the manufacturer’s instructions may invalidate the warranty but does not aect statutory rights.
Customer Name
Address
Telephone Number
Heat Pump Make and Model
Heat Pump Serial Number
Commissioned by (print name) Certified Operative Reg. No.
[1]
Company Name & Address Commissioning Date
Telephone No.
Building Regulations Notification Number (if applicable)
[2]
Commissioning Engineer’s Signature
Customer’s Signature
(To confirm demonstration of equipment and receipt of appliance instructions)
ALL INSTALLATIONS
The heating, hot water and ventilation systems complies with the appropriate Building Regulations Yes
All electrical work complies with the appropriate Regulations Yes
The heat pump and associated products have been installed and commissioned in accordance with the manufacturer’s instructions Yes
The operation of the heat pump and system controls have been demonstrated to the customer Yes
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer Yes
ADDITIONAL SYSTEM INFORMATON
Additional heat sources connected
Gas Boiler Oil Boiler Electric Heater Other
DOMESTIC HOT WATER MODE
Is the heat pump connected to a hot water cylinder? Unvented Vented Thermal Store Not Connected
Hot water has been checked at all outlets Yes
CENTRAL HEATING MODE
Heating Flow Temperature °C Heating Return Temperature °C
ALL SYSTEMS
The heating system has been filled and pressure tested Yes
Expansion vessel for heating is sized, fitted & charged in accordance with manufacturer’s instructions Yes
The heat pump is fitted on a solid/stable surface capable of taking its weight Yes
The system has been flushed and cleaned in accordance with BS7593 and heat pump manufacturer’s instructions Yes
What system cleaner was used?
What inhibitor was used? Qty litres
Is the system adequately frost protected? Yes
CONTROLS - SYSTEM AND HEAT PUMP Tick the appropriate boxes if applicable
1. Time & Temperature Room Thermostat & Programmable Load/Weather Optimum Start
Control to Heating Programmer/Timer Roomstat Compensation Control
2. Time & Temperature Cylinder Thermostat & Combined with Heat
Control to Hot Water Programmer/Timer pump main controls
3. Heating Zone Valves Fitted Not Required
4. Hot Water Zone Valves Fitted Not Required
5. Thermostatic Radiator Valves Fitted Not Required
6. Heat Pump Safety Interlock
[3] Provided
7. Outdoor Sensor Fitted Not Required
8. Automatic Bypass System Fitted Not Required
9. Buer Vessel Fitted Yes No If YES, Volume Litres
OUTDOOR COLLECTOR
Are all external pipeworks insulated? Yes
Is the fan free from obstacles and operational? Yes
Has suitable consideration been made for waste water discharge? Yes