EasyManua.ls Logo

Nibe F2040 Series - Page 86

Nibe F2040 Series
92 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
P
Pipe connections, 27
Charge pump, 27
Docking alternatives, 29
General, 27
Pipe connections flex hose, 28
Pipe coupling heating medium circuit, 27
Pressure drop diagram, 28
Water volumes, 27
Pipe connections flex hose, 28
Pipe coupling heating medium circuit, 27
Power connection, 33
Preparations, 43
Pressure drop diagram, 28
R
Readjusting, heating medium side, 45
Recovery, 5
Removing the covers, 12
Removing the front panel, 13
Removing the side panel, 14
S
Safety information, 4
Marking, 4
Symbols, 4
Symbols on F2040, 4
Warranty information, 6
Sensor placement, 50
Connection to board (AA23, 52
Connection to board (PWB1), 50
Sensor placement in F2040, 53
Sensors etc., 50
Sensor placement in F2040, 53
Sensors etc., 50
Serial number, 4
Sound pressure levels, 64
Start-up and inspection, 44
Supplied components, 11
Symbols, 4
Symbols on F2040, 4
T
Technical data, 60
Dimensions and setting-out coordinates, 60
Electrical circuit diagram, 76
Sound pressure levels, 64
Technical Data, 65
Technical Data, 65
The heat pump design, 15
Component locations, 15
Electrical components, 26
Electrical connection, 23
List of components, 22
Transport and storage, 9
Troubleshooting, 48
Basic actions, 48
F2040 does not communicate, 48
F2040 is not operational, 48
High room temperature, 49
Large amount of water below F2040, 49
Low hot water temperature or no hot water, 49
Low room temperature, 49
Sensor placement, 50
W
Warranty information, 6
NIBE F2040Item register86

Table of Contents

Related product manuals