EasyManua.ls Logo

NSK NLZ E - Installing Main and Control Units

Default Icon
112 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
CAUTION
Make sure that each part is properly connected. Improper connections might cause faulty operation, LED lighting
failure and water or air leakage.
3-1
Installing the Main Unit and the Control Unit
1
Fix the main unit to the dental unit using the
screws. As shown below:
2
Place the control unit on the tray of the dental
unit.
M4x30, M5x30
with the nut
( included)
M4 flat head screw
( included )
3
Bundle the link cable appropriately and fix it by cable tie.
Cable tie
(included)
4
If you wish to install as shown below, optional parts are available for purchase.
( Refer to “ 9-3 Optional Parts List ” )
Installation example using
NLZ STAY
Installation example using
NLZ MOUNTING PLATE
Preparations for Use
3

Table of Contents

Related product manuals