EasyManua.ls Logo

Nvidia Spectrum-2 SN3420 - Page 88

Nvidia Spectrum-2 SN3420
160 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
NVIDIA Spectrum-2 SN3000 1U and 2U Switch Systems Hardware User Manual 87
4. Route the power cable through either of the inner rails, and reassemble the brackets
by screwing the 3 screws (per rail) provided with the rail-kit (H) with a torque of
0.7±0.05Nm.
Cable Accommodation
5. Secure the chassis in the inner rails screwing the 2 at head Phillips screws (G) in the
designated points with a torque of 1.5±0.2 Nm.
Securing the Chassis in the Inner Rails

Table of Contents

Related product manuals