EasyManua.ls Logo

Olympus BH-2 Series - The Prepared Guide Block Is Ready to be Reinstalled; Figure 70 - Prepared Guide Block Ready for Reinstallation

Olympus BH-2 Series
23 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CompleteTeardown,Cleaning,andReassemblyoftheOlympusBH2SlidingFocusBlock Revision2 Page22of23
cleaning with the cotton swabs, to avoid transferring
the grease further onto the guide rails.Keep at this
until all visible traces of grease have been scrubbed
fromtheparts.Thoroughremovalofthisheavygrease
is important, since any exposed grease can lead to an
accumulationofdustand
debriswhichmighteventually
foultheslidingfocusblockmechanism.
ThePreparedGuideBlockisReadytobeReinstalled
The prepared guideblock, with theguide railsinstalled
into the side groove and held in place by the heavy
grease, is now ready to be reinstalled into the sliding
focusblockmechanism(seeFigure70).
Figure70Preparedguideblockreadyforreinstallation

Table of Contents

Related product manuals