EasyManua.ls Logo

Omron BA75T - 4 Maintenance and Inspection; Checking the Battery; Battery Life Expectancy; Self-Diagnosis Test

Omron BA75T
104 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Maintenance and Inspection
4-1 Checking the battery
4 Maintenance and Inspection
For cautions when maintaining the UPS, refer to “Caution (for maintenance)” shown in the
“Safety precautions” of the beginning of this manual.
4-1 Checking the battery
The lead battery used in the unit has a limited lifespan.
(The life varies depending on your storage/use environment and backup frequency.)
The nearer the end of the life is, the more rapidly deterioration proceeds.
4-1-1 Battery life expectancy
(* Not a guaranteed performance)
Ambient temperature
Battery life expectancy
25°C
5 years
30°C
3.5 years
35°C
2.5 years
40°C
1.7 years
4-1-2 Self-diagnosis test
This test performs a failure diagnosis on the unit and performs a test to check for battery
deterioration.
Use the procedure below to check whether a circuit failure has occurred inside the unit and
whether battery replacement is required.
There are two, automatic testing and manual testing, in the self-diagnosis test as follows.
Automatic testing
The self-diagnosis test is automatically performed at the factory settings, at the following
timing in the state that the UPS is connected to a commercial power source and the charge
of the battery has been completed. User’s operation to start the test is unnecessary.
When the “Power” switch is turned ON from OFF
Performed with one time per four weeks on the condition that the “Power” switch is ON
When charge of the battery is not completed, the self-diagnosis test is not performed
immediately.
It is performed automatically after the completion of charge.
BA75T/BA100T/BA100R
57
4

Table of Contents

Related product manuals