EasyManua.ls Logo

Omron E5AC-T

Omron E5AC-T
438 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 - 43
6 Parameters
E5@C-T Digital Temperature Controllers User’s Manual (H185)
6-5 Adjustment Level
6
w1 to 8on
w1 to 8of
Work Bit 1 to 8 ON Delay
Work Bit 1 to 8 OFF Delay
The work bit operation type must not be set to OFF.
ON Delay
When the results of a work bit logic operation is ON, the work bit is turned ON after the
time specified in the parameter elapses.
OFF Delay
When the results of a work bit logic operation is OFF, the work bit is turned OFF after the
time specified in the parameter elapses.
z Related Parameters
Auxiliary Output 1 to 4 Assignment (Advanced Function Setting Level): Page 6-98
plcm
Communications Monitor
Communications must be supported.
The Protocol Setting parameter must be set to Host
Link (FINS) or the MC Protocol.
The Communications Monitor parameter displays the communications cycle time of the
E5@C-T.
If communications are not possible with the PLC, c.err is displayed. When
communications are restored, the cycle time is displayed again.
Also refer to the E5
@
C-T Digital Controllers Communications Manual (Cat. No. H186) for
information on communications.
Function
Setting
Setting range Unit Default
0 to 9999 Seconds 0
See
See
Function
Setting
Monitoring range Default
Normal: 0 to 9999 ms, If 9999 ms is exceeded: ]]]]
Error: c.err
---

Table of Contents

Related product manuals