Procedure from installation to operation
S8BA-24D24D□□□LF
2
Procedure from installation to operation
The procedure from installation to operation is shown below.
Start
Read “Safety Precautions”
Page 8
Remove the product from the
package and check the contents
2. Preparation
Perform installation and connection
3. Installation and connection
Are you using either of the
following functions?
- Automatic shutdown software
- I/O signal functions
6. To perform shutdown processing of the
devices when a power failure occurs
7. Using the I/O signal functions
Check the operation
4. Check and start operation
Charge the battery*
Operate
4. Check and start operation
* The battery in the UPS has not been charged
prior to shipment. Charge the battery when you
use the UPS for the first time.
Perform maintenance and inspection
5. Maintenance and Inspection
Replace the battery
5.2 Replacing the battery
The battery must
be replaced
Installation/connection
Preparation for operation
Operate
Perform maintenance
and inspection
Yes
No
No
Yes

Table of Contents