Version 1.2.4 - 2022-10-2624 Translation of original instruction
S275N | S275NV
EN
S275N_S275NV_GB_3.fm
3.5.5 Drip pan
Attach the collecting tray on the chip tray.
3.5.6 Material stop
Turn the stop bar into the threaded hole and clamp the stop bar with the nut.
3.6 Electrical connection
3.6.1 Electrical connection S275N
WARNING!
The three-phase electrical connection of the S275N may only be performed by an
electrician or under the guidance and supervision of an electrician.
Qualification of personnel on page 9
Schaltplan - Wiring diagram 400V - S275N - Einkanalig - Single channel on page 55
Schaltplan - Wiring diagram 400V - S275N - Zweikanalig - Double channel on page 56