EasyManuals Logo

Orion FLEX RTD User Manual

Orion FLEX RTD
166 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #116 background imageLoading...
Page #116 background image
Machine Manual Orion
Flex Stretchwrapper Revision 3.0
Maintenance 15 February 2016
Page 5-6
Preventative Maintenance Schedule
PM Intervals
PM Intervals are based on an average usage of a 16 hour production day.
All general information about machine maintenance is based on normal machine working
conditions: indoor, moderate dust and low moisture environment, and maximum rotation
of 15 RPM. They should be regarded as guidelines, reviewed and corrected according to
requirements of actual use and conditions.
All H&L Standard Series
5,760 Loads or one month
Inspect rubber stretch rollers. Clean as needed per instructions in manual.
Inspect belt condition. Adjust as needed.
17,280 Loads or three months.
Inspect under turntable. Clean debris as needed.
Inspect turntable support casters for good condition.
Inspect turntable chain. Apply a light coating of lubricant per instructions in manual.
Inspect prestretch chain and belt. Tension as needed. Apply a light coating of lubricant
per instructions in manual.
Table 5-2. PM Frequency
FREQUENCY PERIOD DESCRIPTION
12 LPH (Hour)
96 LPS (Shift)
192 LPD (Day)
5760 LPM (Month)
17,280 LP3M (3Months)
34,560 LP6M (6Months)

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Orion FLEX RTD and is the answer not in the manual?

Orion FLEX RTD Specifications

General IconGeneral
BrandOrion
ModelFLEX RTD
CategoryStretch Wrapping Systems
LanguageEnglish

Related product manuals