EasyManua.ls Logo

Ormazabal cpg.0 ENA Series

Ormazabal cpg.0 ENA Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
IG-273-EN version 03; 05/08/2020
60
Operations sequence General instructions
cpg.0 ENA range
3. Operate the “I” pushbutton to close the circuit-breaker.
The circuit-breaker status indicator shows closed.
Whenever the springs are discharged, charged
as explained in the section "7.2.1. Circuit breaker
(cpg.0-v)" "Connection".
Figure 7.73. Left busbar earthing sequence (iii)
To open the earthing connection follow the sequence
described in reverse order. To open the circuit breaker press
the pushbutton “0”.

Related product manuals