IG-273-EN version 03; 05/08/2020
43
General instructions
cpg.0 ENA range
Operations sequence
7.1.3. Busbar earthing switch (cpg.0-pt)
Initial conditions: Open the disconnectors of all
cubicles on that section of busbars.
Figure 7.34. Details of the manual driving lever of the disconnector
To carry out any operation on the disconnector shaft,
position the interlock in disconnector position (left):
Figure 7.35. “Disconnector” position of the selector