EasyManua.ls Logo

Panasonic FP-I4C - 2 Installation; General Installation Procedure

Panasonic FP-I4C
31 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
2 Installation
2 Installation
2.1 General installation procedure
Mount the unit and connect the PLC and all communication cables before you turn on the
power supply.
Perform the installation with the power turned off.
Before touching the unit or equipment, always touch some grounded metal to discharge
any static electricity you may have generated (especially in dry locations). The discharge
of static electricity can damage parts and equipment.
Install the FP-I4C unit in the following order:
1. Mount the FP-I4C unit on a DIN rail or use a mounting plate.
2. Connect the FP-I4C unit to a PC with a standard Ethernet cable (at least Category 5).
Make sure you do not have an IP address conflict. The ETH0 port is configured as a
DHCP client. The ETH1 port is configured with a pre-defined fixed IP address.
Please read the instructions on how to connect the FP-I4C unit to the network.
3. Connect an FP series PLC via RS232C, USB, or RS485.
For wiring examples, refer to the section on wiring or to the “FP-I4C Installation
Instructions” leaflet.
4. Connect the power supply.
Make sure you read the information on how to connect the power supply.
Related topics
Connect the FP-I4C unit directly to a PC (page 27)
Connect the FP-I4C unit to a PC via DHCP server (page 28)
Connection to PLC TOOL port using cable AIGT8192 (page 23)
Connection to PLC COM port (page 23)
Wire the power supply (page 25)
16 FP-I4C

Other manuals for Panasonic FP-I4C

Related product manuals